Wadi El Nile

Five built forms

Work that reads the flood line.

Floodmark chapters — a capability reel, not a sold portfolio.

05 forms

01 / 05

A river intake

On a flood bank

Concrete that reads the waterline before it touches it. One mouth. One current.

Open the work

02 / 05

A desert spine

A long axis under sun

A service line cutting emptiness the way a flood line is drawn on sand.

Open the work

03 / 05

A low span

Over a quiet channel

A crossing that does not boast height. It stays close to water and leaves the horizon intact.

Open the work

04 / 05

A silt court

A yard that reads deposit

Four edges and quiet water in the middle. The court holds the flood without sealing it.

Open the work

05 / 05

A night datum

A measure after recession

Horizontal layers recede like a waterline. Night clarifies the line instead of hiding it.

Open the work